The upgrade of the Santa Cruz-La Laguna main road will cost €15.2 million and take two years to complete.

Pedro
By Pedro
1 Min Read
Disclosure: This website may contain affiliate or sponsored links, which means I may earn income from the link placements. Links are vetted for safety and compliance.



Tenerife’s Cabildo has announced a €15.2 million investment to upgrade the TF-180 road around Ofra to an urban standard. The project aims to start this year and is expected to take 24 months, benefiting over 10,000 daily drivers.

⭐ Want More Canarian News?
Add Canarian News to your Preferred Sources in Google.
Takes just a few seconds

The works will focus on the section between the Cervecera and Vuelta de Los Pájaros. The plans include the creation of continuous pedestrian pathways with 1.8-metre-wide sidewalks on both sides.

The road will feature one lane in each direction, with a roundabout at the Ofra junction and the introduction of traffic signals and central lanes to better manage left turns.

Additionally, the proposal includes establishing about 100 parking spaces, including designated spots for those with reduced mobility. Improvements will be made to bus stops, new street furniture will be installed, public lighting will be enhanced, and green spaces will be created where possible.

The upgrade will also include a new separate drainage network to address existing rainwater drainage issues, designed to handle expected heavy rainfall over 50 years.

During the public consultation period, the Cabildo received 22 objections, addressing them with one fully accepted, 17 partially accepted, and four rejected.



Source link .

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

17 + seventeen =