Canary Islands-CC Calls for Expedited Renewal of Power Plants from Fuerteventura

Pedro
By Pedro
3 Min Read
Disclosure: This website may contain affiliate or sponsored links, which means I may earn income from the link placements. Links are vetted for safety and compliance.



Call for Speedy Power Plant Upgrades in Canary Islands

⭐ Want More Canarian News?
Add Canarian News to your Preferred Sources in Google.
Takes just a few seconds

1º Canarias-Coalición Canaria (1ºCAN-CC) is urging the government to expedite updates to the Canary Islands’ power plants to minimise the risk of blackouts. Teodoro Sosa, the coalition’s candidate for Congress in Las Palmas, made the announcement beside the Las Salinas power plant in the Puerto del Rosario area, accompanied by fellow candidates Juan José Rodríguez and Nuria Cabrera.

Sosa reported that the islands experienced nine total blackouts in the last eight years, contrasting with zero in the Balearic Islands during the same period. He linked the poor reliability of the power supply to the ageing plants and stressed the impact on vital services, such as water desalination. The coalition is advocating for the replacement of facilities over 40 years old with more efficient, renewable solutions to ensure reliable supply.

State Competitions and Power Projections for Lanzarote and Fuerteventura

Sosa indicated that discussions with the government would commence following the energy emergency declaration made by the Canary Islands’ government in October 2023. He pledged to monitor the first state competition, which is set to be resolved by February 2026. The Ministry for Ecological Transition confirmed the allocation of over 1,000 megawatts across the islands, including the establishment of 25 new plants and improvements to nine existing ones, with an estimated investment of around €500 million for non-mainland territories.

He also vowed to push for rapid progress on a second competition initiated by the Ministry on 14 July, aimed at delivering 707.5 megawatts of firm capacity by 2031, with 95 megawatts designated for Lanzarote and Fuerteventura.

Shutting Down Las Salinas and the Zurita Alternative

Sosa highlighted the dismantling of the Las Salinas plant as the culmination of a campaign by Asamblea Majorera-Coalición Canaria lasting over two decades. The removal of the first turbine began in May, marking the first step toward its permanent closure. “We need a strong voice in Madrid to address the real issues facing citizens, such as the right to a robust energy system,” he stated.

Rodríguez and Cabrera reminded attendees that the local council and the Fuerteventura Cabildo opposed the expansion of Las Salinas and supported the Zurita alternative, which offers municipal land to distance power generation from residential areas. The coalition also plans to install renewable energy sources on already occupied spaces such as rooftops, car parks, and public buildings.

During a two-day campaign event in Fuerteventura, the candidates engaged with residents of Los Molinos to hear their concerns and visited the International Kite Festival at Grandes Playas in Corralejo.



Source link

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

14 − eleven =